Case Study

Pro­cess­ing Plant – Improve­ment Hard Rock Tons per Hour / Tons per Day

2022/01/06

Our client, one of the world’s lead­ing mid-tier gold min­ing company.

Key results

Poten­tial Improve­ment Hard Rock Tons per Hour at Gyra­to­ry Crusher

40% Test­ed

Opti­miz­ing our Process Plant begins with man­ag­ing the sizes of the ore at the dif­fer­ent stages of the process. This begins with the larg­er size ore being deliv­ered by Haul Trucks from the mine to the very fine par­ti­cle size required to recov­er the gold from the ore.
 
At the ini­tial stage, the open­ing of the Gyra­to­ry Crush­er was reduced from 6.0 inch­es to 4.5 inch­es. The open­ing at the Sec­ondary Crush­er was reduced to 1.5 inch­es. The Apron Feed­er, anoth­er com­po­nent ear­ly in the process, has been rebuilt increas­ing a test­ed capac­i­ty from 1,200 to 1,700 tons per hour. The repair on the tun­nel also now enables the speed increase of the Apron Feed­er from 65% to 75%.
 
In addi­tion to the increased process capac­i­ty, less ener­gy is required which reduces our costs and helps the environment.
 
Also, a refur­bished rock break­er is cur­rent­ly being installed to reduce down­time and increase throughput.
 
Ele­ments
- Man­ag­ing the “F80” / size of ore feed­ing into the Plant
- Man­ag­ing the CV2 con­vey­or (Hard Rock) and CV3 con­vey­or (Soft Rock)
- Replaced the Head Pul­ley for less slip­page and less lag­ging
- Poten­tial now to process dai­ly demand of ore in 12 hours using two 777s and one 993LU for improved blend­ing
- Refur­bished rock break­er now being installed
 
* We take client con­fi­den­tial­i­ty seri­ous­ly. While we have kept the brand anony­mous, the results are real.
 

Share This Case Study

How We Can Help

Related Industry

Connect with us

Let us work with you to achieve exceptional results.

Share this case study

Other case studies

Oper­a­tional Excellence

Case Studies

2022/01/06
Mine Oper­a­tions – Reduc­ing Wait Time

Oper­a­tional Excellence

Case Studies

2023/03/27
Max­i­miz­ing Busi­ness Out­comes through Effec­tive Net­work Maintenance

Oper­a­tional Excellence

Case Studies

2022/02/09
A stain­less steel man­u­fac­tur­er increased its over­all month­ly pro­duc­tion by 16% in less than 6 months

Case Studies

Imple­men­ta­tion

A food and bev­er­age com­pa­ny grows sales by 19% with new organ­i­sa­tion design
24 Apr 2022

Case Studies

Oper­a­tional Excellence

Ware­house and Inven­to­ry – Optimization
06 Jan 2022

Case Studies

Imple­men­ta­tion

A util­i­ties com­pa­ny improves pro­duc­tiv­i­ty and saves costs
13 Jun 2022