Case Study

Oper­a­tional Excellence

A stain­less steel man­u­fac­tur­er increased its over­all month­ly pro­duc­tion by 16% in less than 6 months

2022/02/09

 

Key results

16%

Increase in over­all  
month­ly production

10%

Indi­rect cost ben­e­fit at
Plant 1

15%

Indi­rect cost ben­e­fit at
Plant 2

About the client 

Our client is one of Indi­a’s lead­ing pro­duc­ers and sup­pli­ers of stainless-steel long prod­ucts such as round bars, con­tin­u­ous cast billets/blooms, thread­ed bars, bright bars, and forged bars. It is also one of the most tech­no­log­i­cal­ly advanced stainless-steel man­u­fac­tur­ing com­pa­nies in India and has a glob­al presence.

The chal­lenge

The client want­ed a more appro­pri­ate organ­i­sa­tion­al design for its plants. We were brought in to help them achieve two objectives: 

  • To revamp the organ­i­sa­tion­al struc­ture of the bright bar pro­cess­ing unit, as well as two man­u­fac­tur­ing units 
  • To improve through­put at the bright bar pro­cess­ing unit by installing man­age­ment con­trol sys­tems (MCS) that han­dled pro­duc­tion, plan­ning and maintenance 

What we did

The project was bro­ken down into two work­streams, with each team made up of employ­ees from the client com­pa­ny, senior plant man­age­ment, and Reynard experts. 

Work­stream 1: Organ­i­sa­tion design and restruc­tur­ing — all tar­get plants 

Focus: Inte­grate organ­i­sa­tion struc­tures, process­es, and peo­ple 

  • Eval­u­at­ed over 1,000 posi­tions involved in the man­u­fac­tur­ing process of the var­i­ous products. 
  • Car­ried out detailed obser­va­tions of the activ­i­ties under­tak­en by shift work­ers to deter­mine the most appro­pri­ate organ­i­sa­tion struc­ture required to per­form these activities. 
  • Con­duct­ed inter­views and com­plet­ed obser­va­tion stud­ies of the man­age­r­i­al lay­er to under­stand the activ­i­ties and process­es under­tak­en to iden­ti­fy and imple­ment improvements. 
  • Deter­mined the cor­rect organ­i­sa­tion struc­ture, with effi­cient spans of con­trol, for the dif­fer­ent pro­duc­tion areas. 

Work­stream 2: Through­put improve­ment — bright bar pro­cess­ing unit 

Focus: Improve the plan­t’s pro­duc­tion, main­te­nance, and plan­ning sys­tems 

  • Iden­ti­fied gaps in the pro­duc­tion, main­te­nance, qual­i­ty and plan­ning processes. 
  • Ini­ti­at­ed stan­dards for plan­ning and per­for­mance mon­i­tor­ing of machines. 
  • Set up a for­mal struc­ture for month­ly, week­ly and dai­ly planning. 
  • Set up month­ly pro­duc­tion plan­ning process­es based on pend­ing orders, works in progress (WIP), and raw mate­r­i­al (RM) avail­abil­i­ty. RM and WIP was also seg­re­gat­ed at the tar­get plants based on shape, size, process stage and so on. 
  • Intro­duced an MCS to improve the qual­i­ty of incom­ing black mate­r­i­al from the man­u­fac­tur­ing units — a prob­lem that was also affect­ing pro­duc­tion in the bright bar pro­cess­ing unit. 
  • Designed and imple­ment­ed an effec­tive man­age­ment sys­tem that empha­sised short inter­val controls.

Results

Besides the key results that were obtained after the pro­jec­t’s imple­men­ta­tion, the client could final­ly address the inef­fi­cien­cy gaps in the process and man­age­ment sys­tems sustainably. 

As a result, the tar­get plants achieved their high­est ever month­ly pro­duc­tion num­bers on two sep­a­rate occa­sions dur­ing the 22-week timeframe. 

 

Share This Case Study

How We Can Help

Related Industry

Connect with us

Let us work with you to achieve exceptional results.

Share this case study

Other case studies

Rev­enue Growth

Case Studies

2023/03/27
By switch­ing to a new way of work­ing, a South­east Asian multi-finance com­pa­ny achieved US$4.5 mil­lion in savings

Case Studies

2023/03/27
A South Amer­i­can pri­vate san­i­ta­tion com­pa­ny improved its field pro­duc­tiv­i­ty by 25% — and per­ma­nent­ly trans­formed its operations

Oper­a­tional Excellence

Case Studies

2022/01/26
A min­ing com­pa­ny reduces costs after improv­ing oper­a­tional efficiency

Case Studies

Imple­men­ta­tion

A util­i­ties com­pa­ny improves pro­duc­tiv­i­ty and saves costs
13 Jun 2022

Case Studies

Rev­enue Growth

By switch­ing to a new way of work­ing, a South­east Asian multi-finance com­pa­ny achieved US$4.5 mil­lion in savings
27 Mar 2023

Case Studies

Oper­a­tional Excellence

A phar­ma­ceu­ti­cal com­pa­ny cre­ates a cul­ture of productivity
13 Jun 2022